The order for 7 cabin sliding windows has been placed, so design and so on has begun. I put down a 50% deposit. Per SDG, production will start in 3 weeks, they are very busy. Windows should ship in 7 weeks. If anyone else wants a window, I think you have about a week to decide and still be able to be part of this production run.
SDG said the vertical sliding window will slide half the window. The screen will slide as well.
Hey Moose, it's funny but I thought the same thing you did. What to do with the window we remove? Why not cut out below the new window and have a semi-full window door?
Not to dis' anyone, but I don't think I really want a full glass door. My luck, I will pull a Three Stooges trick and put something through the glass. I'll just keep it until I put something through the new window - I will at least have a replacement.
Again, thanks to everyone on the site for indulging us in this thread. Things happened very quickly. I hope everyone will be happy. We are taking a chance since no one knows if the window will give us the ventilation we really want or need. But it is the best we can do AND because we came together, Factory, Brats, and Manufacturer, we saved some bucks and will have a quality window to boot.
Keep your checks and money orders coming.
Best to all
John
Swee Pea