Teufelshunde
New member
Hey all,
I was off work for 2-1/2 months and took on quite a few projects !
I decided to use my time wisely and remodeled my entire interior and for those of you who saw my balsa core rot project I have completed it. Pictures before and after are in my album posted today. I have a few more things to button up and then I’ll be ready to fish again :thup
Below is a list of things I did to fishwisher during my COVID time off if your interested.
New window rubbers and scuppers.
Removed all bolt through and screwed items - over drilled and epoxied.
Installed new ladder.
Fixed rot around Bomar Hatch (epoxied) and resealed.
Fixed core rot on deck and starboard bulkhead.
Painted deck after repairs.
Fixed anchor light and re-wired.
New wiring for bilge pump.
Took apart windlass cleaned and re-greased.
Color sanded and polished most of boat.
Installed new C-Dory graphics.
laminated,cut and installed new wood for interior.
Installed new Lonseal flooring.
All teak wood sanded and refinished.
New seals for lazarette’s.
Rear tie down u-bolt replaced.
Had a friend reupholster seats and sleeping area.
Epoxied various holes.
Moved heater closer to the rear to allow more room for captains chair.
I’m sure I’m missing something but I’m drawing a blank right now!
(It happens)
:lol:
Now I’m going to have cold one.
Fish on!!!
I was off work for 2-1/2 months and took on quite a few projects !
I decided to use my time wisely and remodeled my entire interior and for those of you who saw my balsa core rot project I have completed it. Pictures before and after are in my album posted today. I have a few more things to button up and then I’ll be ready to fish again :thup
Below is a list of things I did to fishwisher during my COVID time off if your interested.
New window rubbers and scuppers.
Removed all bolt through and screwed items - over drilled and epoxied.
Installed new ladder.
Fixed rot around Bomar Hatch (epoxied) and resealed.
Fixed core rot on deck and starboard bulkhead.
Painted deck after repairs.
Fixed anchor light and re-wired.
New wiring for bilge pump.
Took apart windlass cleaned and re-greased.
Color sanded and polished most of boat.
Installed new C-Dory graphics.
laminated,cut and installed new wood for interior.
Installed new Lonseal flooring.
All teak wood sanded and refinished.
New seals for lazarette’s.
Rear tie down u-bolt replaced.
Had a friend reupholster seats and sleeping area.
Epoxied various holes.
Moved heater closer to the rear to allow more room for captains chair.
I’m sure I’m missing something but I’m drawing a blank right now!
(It happens)
:lol:
Now I’m going to have cold one.
Fish on!!!