Unfortunately not, the boat is still down in Nunica getting a new trailer made. It's built ,but waiting for other trailers to be finished so that a 'batch' can be sent off to get galvanized. Sounds like I might be waiting till sometime in late October. The new trailer should fit inside the garage much easier since it is specifically built for a 16 C-Dory (I had them build it lower than the EZ Loader that it came on) and it has a shorter overall length too. The galvanizing was necessary as we are planning to move to the Kenai Peninsula in the next few years and we plan on bringing the boat along.
Well, we are currently beached at Gull island on the north side of lake St. Clair. Gonna take a nap and later watch a movie. If anyone is near, stop on by.