got my water system done, shore power installed,batterie charger,outlets,the boat had 2 group 24 batt,removed the one from the port lazaret and installed 2 group 31 in the space between the fuel tanks, I have been doing marine eletrical work for 15 years, cant believe the wiring that was done on...