Hi, Interested Parties
Just returned from the factory(s) and EQ checking on progress of the Tomcat 255.
The deck section is done and looks good, at least as much as I could tell because it was laying upside down on a frame over my head! My biggest concern is the fishbox/seat area across the stern of the cockpit (about 46"). That's where my compressor goes, and it looks like it will just fit.
They were polishing the mold for the hull. It, too, was upside down and matt black so I couldn't see much detail, but it is nearing completion. They were working on the cabin deck section while we were there.
All this is taking place at the old Monroe facility. When all the molds are ready, they'll bring them to Auburn for actual molding.
They were expecting a week to 10 days before #1 is molded. If it all looks good, they'll do #2. So, 6 weeks after it comes out of the mold brings us to late July.
Les will be doing the rigging, including installation of 2x200 Evinrudes, not for speed but for 30 kts with a full load and no strain.
I'll be back up when they mold up #2 and install the compressor.
Getting close!
Scaley
Just returned from the factory(s) and EQ checking on progress of the Tomcat 255.
The deck section is done and looks good, at least as much as I could tell because it was laying upside down on a frame over my head! My biggest concern is the fishbox/seat area across the stern of the cockpit (about 46"). That's where my compressor goes, and it looks like it will just fit.
They were polishing the mold for the hull. It, too, was upside down and matt black so I couldn't see much detail, but it is nearing completion. They were working on the cabin deck section while we were there.
All this is taking place at the old Monroe facility. When all the molds are ready, they'll bring them to Auburn for actual molding.
They were expecting a week to 10 days before #1 is molded. If it all looks good, they'll do #2. So, 6 weeks after it comes out of the mold brings us to late July.
Les will be doing the rigging, including installation of 2x200 Evinrudes, not for speed but for 30 kts with a full load and no strain.
I'll be back up when they mold up #2 and install the compressor.
Getting close!
Scaley