Search results

  1. 4. Starboard side ready to reinstall hardware. 
There was some air bubbles, shrinkage or seapage of the epoxy into the foam core, so it took two applications of epoxy.

    4. Starboard side ready to reinstall hardware. There was some air bubbles, shrinkage or seapage of the epoxy into the foam core, so it took two applications of epoxy.

    4. Starboard side ready to reinstall hardware. There was some air bubbles, shrinkage or seapage of the epoxy into the foam core, so it took two applications of epoxy.
  2. 3. Number 10 screws drilled out with 3/8" drill bit, then additional yellow closed cell foam around the inside of the 3/8" hole removed with a "Dremel". 3/8" Swim step bolt holes redrilled out to 7/16".

    3. Number 10 screws drilled out with 3/8" drill bit, then additional yellow closed cell foam around the inside of the 3/8" hole removed with a "Dremel". 3/8" Swim step bolt holes redrilled out to 7/16".

    3. Number 10 screws drilled out with 3/8" drill bit, then additional yellow closed cell foam around the inside of the 3/8" hole removed with a "Dremel". 3/8" Swim step bolt holes redrilled out to 7/16".
  3. 3. You can see the yellow closed cell foam core.

    3. You can see the yellow closed cell foam core.

    3. You can see the yellow closed cell foam core.
  4. 3. Port side of cockpit, ahead of the fuel tank. The holes have now been filled with "System Three" Cold Cure epoxy. I used a syringe to fill the bottom of the hole first, and work the air to the top and out.

    3. Port side of cockpit, ahead of the fuel tank. The holes have now been filled with "System Three" Cold Cure epoxy. I used a syringe to fill the bottom of the hole first, and work the air to the top and out.

    3. Port side of cockpit, ahead of the fuel tank. The holes have now been filled with "System Three" Cold Cure epoxy. I used a syringe to fill the bottom of the hole first, and work the air to the top and out.
  5. 2. Transom Fastener Improvements

    2. Transom Fastener Improvements

    2. Transom Fastener Improvements
  6. 2. Drain plug hole Dremeled out and ready to receive epoxy.

    2. Drain plug hole Dremeled out and ready to receive epoxy.

    2. Drain plug hole Dremeled out and ready to receive epoxy.
  7. 2. I used a 3/8" drill bit to drill through the top of the cockpit deck fiberglass down through the dark grey foam core to touch the bottom layer of the laminated deck. I then took a "Dremel" and hollowed out a greater amount of foam core below the top deck layer of fiberglass to give a greater area to fill in with epoxy.

    2. I used a 3/8" drill bit to drill through the top of the cockpit deck fiberglass down through the dark grey foam core to touch the bottom layer of the laminated deck. I then took a "Dremel" and hollowed out a greater amount of foam core below the top deck layer of fiberglass to give a greater area to fill in with epoxy.

    2. I used a 3/8" drill bit to drill through the top of the cockpit deck fiberglass down through the dark grey foam core to touch the bottom layer of the laminated deck. I then took a "Dremel" and hollowed out a greater amount of foam core below the top deck layer of fiberglass to give a greater...
  8. 1. Transom Fastener Improvements.
Swim step, transducer, trim tabs removed.

    1. Transom Fastener Improvements. Swim step, transducer, trim tabs removed.

    1. Transom Fastener Improvements. Swim step, transducer, trim tabs removed.
  9. 1. Drain Plug removed.

    1. Drain Plug removed.

    1. Drain Plug removed.
  10. 1. Cockpit Floor  Fastener Improvements. All original No. 10 screws and hardware still in place before starting improvements.

    1. Cockpit Floor Fastener Improvements. All original No. 10 screws and hardware still in place before starting improvements.

    1. Cockpit Floor Fastener Improvements. All original No. 10 screws and hardware still in place before starting improvements.
  11. 5. Bar-B-Q Bracket

    5. Bar-B-Q Bracket

    5. Bar-B-Q Bracket
  12. 4. Bar-B-Q Bracket

    4. Bar-B-Q Bracket

    4. Bar-B-Q Bracket
  13. 3. Bar-B-Q Bracket

    3. Bar-B-Q Bracket

    3. Bar-B-Q Bracket
  14. 1. Bar-B-Q Bracket.
-Mahagony, Teak, and 1/2" Birch Plywood.

    1. Bar-B-Q Bracket. -Mahagony, Teak, and 1/2" Birch Plywood.

    1. Bar-B-Q Bracket. -Mahagony, Teak, and 1/2" Birch Plywood.
  15. 2. Bar-B-Q Bracket

    2. Bar-B-Q Bracket

    2. Bar-B-Q Bracket
  16. 24. Cabinets Installed

    24. Cabinets Installed

    24. Cabinets Installed
  17. 23. Cabinets Installed

    23. Cabinets Installed

    23. Cabinets Installed
  18. 21. Cabinets Installed

    21. Cabinets Installed

    21. Cabinets Installed
  19. 20. Cabinets  Installed

    20. Cabinets Installed

    20. Cabinets Installed
  20. 19. Cabinets  Installed

    19. Cabinets Installed

    19. Cabinets Installed
Back
Top