The last major job was to remove the two cranes from the top of the towers. This was done with a huge mobil crane that took the tower cranes down in 8 separate pieces.
The last major job was to remove the two cranes from the top of the towers. This was done with a huge mobil crane that took the tower cranes down in 8 separate pieces.