Now wet core is hogged out of all 3 holes. I attacked it from below too. All 4 stanchion bases had to be done. ith tape over the bottoms we filled all the holes with thickened epoxy, re-drilled and reinstalled the stanchions with new bedding.
Now wet core is hogged out of all 3 holes. I attacked it from below too. All 4 stanchion bases had to be done. ith tape over the bottoms we filled all the holes with thickened epoxy, re-drilled and reinstalled the stanchions with new bedding.