The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Anchor Locker 
Factory said this was foam
Factory said this was foam "FILLED".
Viewed: 651 times.

Cut Out Forward Bulkhead
Cut Out Forward Bulkhead
Viewed: 548 times.

Foam dug out and sanded.
Foam dug out and sanded.
Viewed: 555 times.

Glassed and finished with West System.
Glassed and finished with West System.
Viewed: 600 times.

Deck Pipe. Did not take picture of thru-hull.
Deck Pipe. Did not take picture of thru-hull.
Viewed: 683 times.

Locker access open.
Locker access open.
Viewed: 616 times.

Locker closed and ready for cruising.
Locker closed and ready for cruising.
Viewed: 573 times.

Powered by Gallery v1



Page generation time: 1714316328.53s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on