The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Construction of the new Anna Leigh 
New Hull w/ balsa (Mon 3/14)
New Hull w/ balsa (Mon 3/14)
Viewed: 1560 times.

Partially installed balsa (Mon 3/14)
Partially installed balsa (Mon 3/14)
Viewed: 1463 times.

Hull is out of the mold (Fri 3/18)
Hull is out of the mold (Fri 3/18)
Viewed: 1207 times.

Hull is out of the mold (Fri 3/18)
Hull is out of the mold (Fri 3/18)
Viewed: 1139 times.

Cabin is out of the mold (Fri 3/18)
Cabin is out of the mold (Fri 3/18)
Viewed: 1165 times.

Cabin & Hull (Fri 3/18)
Cabin & Hull (Fri 3/18)
Viewed: 1126 times.

Cabin is on the hull (Thu 3/24)
Cabin is on the hull (Thu 3/24)
Viewed: 1085 times.

Rear view of cabin installed on hull (Thu 3/24)
Rear view of cabin installed on hull (Thu 3/24)
Viewed: 972 times.

Cabin on the hull (Thu 3/24)
Cabin on the hull (Thu 3/24)
Viewed: 944 times.

Cockpit before gas tank install (Thu 3/24)
Cockpit before gas tank install (Thu 3/24)
Viewed: 1209 times.

Gas tank installed Fri 3/25)
Gas tank installed Fri 3/25)
Viewed: 1197 times.

Cockpit transom/floor access panels (Fri 3/25)
Cockpit transom/floor access panels (Fri 3/25)
Viewed: 1170 times.

Top has been put on the cabin (Fri 3/25)
Top has been put on the cabin (Fri 3/25)
Viewed: 1008 times.

Completed hull/cabin/top in the spray booth (Fri 3/25)
Completed hull/cabin/top in the spray booth (Fri 3/25)
Viewed: 990 times.

Rub rail being installed
Rub rail being installed
Viewed: 1055 times.

Windows going in (Wed 4/13)
Windows going in (Wed 4/13)
Viewed: 1096 times.

Windows going in(Wed 4/13)
Windows going in(Wed 4/13)
Viewed: 1030 times.

Cabinets going in (Wed 4/13)
Cabinets going in (Wed 4/13) *
Viewed: 1363 times.

Cabinets/deepsink are in. (Mon 4/18)
Cabinets/deepsink are in. (Mon 4/18)
Viewed: 1225 times.

Cabinets with kick plate cutout.
Cabinets with kick plate cutout.
Viewed: 1181 times.

Port side cabinets installed (Mon 4/18)
Port side cabinets installed (Mon 4/18)
Viewed: 1278 times.

Grab rails and some cleats installed.(Mon 4/18)
Grab rails and some cleats installed.(Mon 4/18)
Viewed: 1096 times.

Thurs (4-21)
Thurs (4-21)
Viewed: 1009 times.

Cockpit rails installed Thurs (4-21)
Cockpit rails installed Thurs (4-21)
Viewed: 986 times.

* Comments available for this item.
Powered by Gallery v1



Page generation time: 1714245463.29s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on