The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Lewmar V700 Windlass installation 
template taped down to mark hole locations
template taped down to mark hole locations *
Viewed: 1438 times.

first holes drilled
first holes drilled
Viewed: 1391 times.

big hole drilled
big hole drilled
Viewed: 1432 times.

windlass bolted down - 3M 4200 sealer
windlass bolted down - 3M 4200 sealer *
Viewed: 1651 times.

windlass motor showing aluminum backing plate
windlass motor showing aluminum backing plate
Viewed: 1594 times.

closeup of windlass motor
closeup of windlass motor
Viewed: 1393 times.

I parked trailer with starboard side high, poured approx 300 ml System Three epoxy into rode locker. When boat is level, starboard side will be low.
I parked trailer with starboard side high, poured approx 300 ml System Three epoxy into rode locker. When boat is level, starboard side will be low.
Viewed: 1554 times.

stainless steel tube epoxied into rode locker drain hole
stainless steel tube epoxied into rode locker drain hole
Viewed: 1461 times.

clamshell covering stainless drain tube. Note screen to keep bugs out.
clamshell covering stainless drain tube. Note screen to keep bugs out. *
Viewed: 1583 times.

* Comments available for this item.
Powered by Gallery v1



Page generation time: 1714984703s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on