The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 RESTORATION/PROJECTS 
a pretty girl in an ugly dress, cant wait to clean her up...
a pretty girl in an ugly dress, cant wait to clean her up...
Viewed: 1711 times.

after 600 miles to get her, it's time for a beer...
after 600 miles to get her, it's time for a beer...
Viewed: 1607 times.

1o years in brackish water takes its toll,  nothing we cant fix though
1o years in brackish water takes its toll, nothing we cant fix though
Viewed: 1294 times.

out with the old, in with the new, a 19' 1965 sabercraft, for a 22' 1981 c-dory angler, the name stays the same, catch 22...
out with the old, in with the new, a 19' 1965 sabercraft, for a 22' 1981 c-dory angler, the name stays the same, catch 22... *
Viewed: 1362 times.

just getting started, prep for new bottom coat
just getting started, prep for new bottom coat
Viewed: 1225 times.

anna does her part to get this thing back in the water, note the hair net, very sexy...
anna does her part to get this thing back in the water, note the hair net, very sexy...
Viewed: 1178 times.

scrubbin' and rubbin', a perfect date...
scrubbin' and rubbin', a perfect date... *
Viewed: 1166 times.

transom rot, just getting started...
transom rot, just getting started...
Viewed: 1306 times.

keep diggin' it out till we find dry core....
keep diggin' it out till we find dry core....
Viewed: 1390 times.

got all the wet stuff out and cleaned up, ready for new transom (2 layers of 3/4
got all the wet stuff out and cleaned up, ready for new transom (2 layers of 3/4" marine plywood with 3 layers of glass between...
Viewed: 1311 times.

used the CNC router to make custom fit parts with grooves to make the bend in the trasom, the seems in each part are staggered to ensure strength..
used the CNC router to make custom fit parts with grooves to make the bend in the trasom, the seems in each part are staggered to ensure strength..
Viewed: 1187 times.

this is the first layer of wood in place, filled the grooves with thickened west system, epoxy resin, next comes three layers of glass and the next piece of wood, then glass over the top of all of it to make it complete
this is the first layer of wood in place, filled the grooves with thickened west system, epoxy resin, next comes three layers of glass and the next piece of wood, then glass over the top of all of it to make it complete
Viewed: 1360 times.

Racks for holding boat during bottom work
Racks for holding boat during bottom work
Viewed: 1130 times.

setting boat on the racks
setting boat on the racks
Viewed: 1150 times.

bottom growth
bottom growth
Viewed: 1175 times.

removal of growth
removal of growth
Viewed: 1185 times.

new transom, interlux epoxy primer and paint
new transom, interlux epoxy primer and paint
Viewed: 1158 times.

new bottom paint, epoxy as well..
new bottom paint, epoxy as well..
Viewed: 1171 times.

paper mock up of new transom box
paper mock up of new transom box
Viewed: 1152 times.

taking measurements of pattern, to be cut out of very light composit core material left over from hydroplane construction
taking measurements of pattern, to be cut out of very light composit core material left over from hydroplane construction
Viewed: 1016 times.

transffered into digital file to cut on CNC router
transffered into digital file to cut on CNC router
Viewed: 1039 times.

router scoring the composit where i will fold it, making the box out of one piece, instead of many glued together
router scoring the composit where i will fold it, making the box out of one piece, instead of many glued together
Viewed: 999 times.

transom box cut out, ready to fold
transom box cut out, ready to fold
Viewed: 1011 times.

folded and ready to se how it fits
folded and ready to se how it fits
Viewed: 1059 times.

* Comments available for this item.
Powered by Gallery v1



Page generation time: 1713565689.82s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on