Sea Angel_ Speed -RPM-FF chart/data
I should note there are 3 batteries aft and abt 100#s of 'other stuff' under the aft deck.
Viewed: 1202 times.
|
A/C plumbing configuration. The pencil marked point after the water pump is where the "primer" valve is located
Viewed: 872 times.
|
Pantographic Arm Installation Instructions
Viewed: 816 times.
|
Deluxe Adjustable Pantographic Arm adjustment procedures for use with 2000 series or MRV wiper motors
Viewed: 860 times.
|
SEA ANGEL's CD25 Owner's Manual Cover.
PM me for a copy of MY, 84 page, 3.96MB, PDF file;else see the Documentation section< under "FORUM"s and down load (thanks Bill)from there.
Viewed: 725 times.
|
|
|
|
|
Sea Angel Electronics updated system's wiring
Viewed: 625 times.
|
|
|
VA Boating requirements
Viewed: 678 times.
|