The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Mechanical Installations and Modifications.  
Changing from Vertical to Horizontal windlass presents some challenges.  First, cover the old, large hole. Drill some new holes and mount a Starboard spacer.  New windlass bolts through spacer and deck, 1.25

Changing from Vertical to Horizontal windlass presents some challenges. First, cover the old, large hole. Drill some new holes and mount a Starboard spacer. New windlass bolts through spacer and deck, 1.25" total thickness. Round cap is for wash down hose.



Powered by Gallery v1



Page generation time: 1714250375.47s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on