The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Propane lockers  
The mold for the port lid top is ready for laying up with 1708 and epoxy. There are several 1/2

The mold for the port lid top is ready for laying up with 1708 and epoxy. There are several 1/2" holes in the bottom of this mold which are filled with wax. This gives a means to tap on the back of the mold with a 1/2" dowel to help pop the part free.


Powered by Gallery v1



Page generation time: 1715750876.19s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on