The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Helm Rework 
Filling the smaller holes and the two openings for the hour meters. the hour meters will get moved down slightly to allow for a voltmeter for each engine
Filling the smaller holes and the two openings for the hour meters. the hour meters will get moved down slightly to allow for a voltmeter for each engine
Viewed: 284 times.

cored panels glued in
cored panels glued in
Viewed: 271 times.

port side, there was some crappy cup holder thing here
port side, there was some crappy cup holder thing here
Viewed: 236 times.

glass over the beveled edges
glass over the beveled edges
Viewed: 267 times.

voltmeters for each battery bank and moved the hour meters down
voltmeters for each battery bank and moved the hour meters down
Viewed: 254 times.

phone holder, ipad holder, and caframo fan
phone holder, ipad holder, and caframo fan
Viewed: 267 times.

Powered by Gallery v1



Page generation time: 1711667727.84s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on