The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Galley drawers 
Under galley sink before
Under galley sink before
Viewed: 576 times.

Added plywood supports painted with 2 coats of penetrating epoxy tabbed to hull with epoxy and strip of glass. The missing section at the top left is necessary to get the correct height at the front.
Added plywood supports painted with 2 coats of penetrating epoxy tabbed to hull with epoxy and strip of glass. The missing section at the top left is necessary to get the correct height at the front.
Viewed: 513 times.

Finished platform. Stained plywood with varathane finish.
Finished platform. Stained plywood with varathane finish.
Viewed: 508 times.

Drawer cabinet to be installed.
Drawer cabinet to be installed.
Viewed: 518 times.

20210514 152945
20210514 152945
Viewed: 235 times.

20210514 152945
20210514 152945
Viewed: 252 times.

20210514 153014
20210514 153014
Viewed: 314 times.

Powered by Gallery v1



Page generation time: 1713865364.15s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on