The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Replacement of leaky hatches 
Leaky lazarette hatch replacement
Leaky lazarette hatch replacement
Viewed: 592 times.

Hatch removed and filling old holes with epoxy, then drilling oversize and filling new holes before drilling for fasteners.  Inside diameter of new hatch frame is smaller, so shims were epoxied in place.
Hatch removed and filling old holes with epoxy, then drilling oversize and filling new holes before drilling for fasteners. Inside diameter of new hatch frame is smaller, so shims were epoxied in place.
Viewed: 622 times.

New hatch bedded with butyl rubber and fastened.
New hatch bedded with butyl rubber and fastened.
Viewed: 596 times.

New hatch both port and starboard complete. No more leaks!
New hatch both port and starboard complete. No more leaks!
Viewed: 620 times.

Powered by Gallery v1



Page generation time: 1711654793.97s (PHP: 100% - SQL: 0%) - SQL queries: 8 - GZIP disabled - Debug on