The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Espar D2 heater install  
The house and starter battery were moved from under the splash well to the passenger side seat box to improve the trim of the boat.  The batteries have Anderson connectors to allow them to be unplugged and removed.

The house and starter battery were moved from under the splash well to the passenger side seat box to improve the trim of the boat. The batteries have Anderson connectors to allow them to be unplugged and removed.


Powered by Gallery v1



Page generation time: 1711651818.06s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on