 Espar D2 heater install  
I also put an access hatch on the other side. Once the engine cables (inside the 4

I also put an access hatch on the other side. Once the engine cables (inside the 4" plastic pipe) are moved out of the way, there should actually be some usable space in here. The new access hatches were installed level with the cockpit deck rather than even with the cockpit trim. That way when they are opened the entire length of the hatch is supported evenly by the cockpit deck, as shown here. Protecting the plastic hinges seemed more important than aesthetics.