The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Rubrail repair 
1 rail separation
1 rail separation
Viewed: 817 times.

2 failed rivets
2 failed rivets
Viewed: 696 times.

3 failed rivets
3 failed rivets
Viewed: 648 times.

4 failed rivet close
4 failed rivet close
Viewed: 703 times.

5 section with good rivets
5 section with good rivets
Viewed: 657 times.

6 cutter
6 cutter
Viewed: 740 times.

7 cutter detail
7 cutter detail
Viewed: 636 times.

9 removed rivet with blob plug
9 removed rivet with blob plug
Viewed: 684 times.

11 empty holes
11 empty holes
Viewed: 654 times.

12 new fastener in place
12 new fastener in place
Viewed: 679 times.

14 new fastener
14 new fastener
Viewed: 672 times.

15 rail back on
15 rail back on
Viewed: 648 times.

16 stern section back on
16 stern section back on
Viewed: 665 times.

17 stern section tight
17 stern section tight
Viewed: 664 times.

18 stern section inside
18 stern section inside
Viewed: 658 times.

19 galley section fastened
19 galley section fastened
Viewed: 681 times.

20 dinette section fastened
20 dinette section fastened
Viewed: 695 times.

21 galley section detail
21 galley section detail
Viewed: 665 times.

22 dinette section detail
22 dinette section detail
Viewed: 663 times.

Rubrail insert Taco
Rubrail insert Taco
Viewed: 730 times.

Rubrail repair on C-Buoy (Scott's boat).
Rubrail repair on C-Buoy (Scott's boat).
Viewed: 610 times.

Rubrail repair on C-Buoy (Scott's boat).
Rubrail repair on C-Buoy (Scott's boat).
Viewed: 729 times.

Powered by Gallery v1



Page generation time: 1713573969.61s (PHP: 100% - SQL: 0%) - SQL queries: 8 - GZIP disabled - Debug on