Home
|
Forums
|
My Topics
|
Calendar
|
Event Signups
|
Memberlist
|
Our C-Dorys
|
The Brat Map
|
Photos
Search
|
Private Messages
|
Profile
|
Log in
|
Register
|
Help
Betty Ann Construction Items
2 images in this album
Gallery:
C-Brat Albums
Album:
Our C-Dory Albums
Album:
C-Nile
Attachment of floor pan (sole) to hull that will be bonded to the the hull. Picture is credited to Les Lampman.
Viewed: 703 times.
Marinaut 215 Core Construction. The fiberglass roving and resin are firmly bonded to the core. Great job TBM! These samples were taken from our hull when the boat was being rigged.
Viewed: 921 times.
Gallery:
C-Brat Albums
Album:
Our C-Dory Albums
Album:
C-Nile
Powered by
Gallery
v1