The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Anchor-locker drain  
Bulkhead seam filleted and fiberglass taped.  This also sealed the disused hole in the locker/berth bulkhead from which I had removed a small eye-nut.

Bulkhead seam filleted and fiberglass taped. This also sealed the disused hole in the locker/berth bulkhead from which I had removed a small eye-nut.


Powered by Gallery v1



Page generation time: 1716386101.72s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on