The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Projects on the Hard 
It was easier to work on Muse at ground level in our favorite boat yard.
It was easier to work on Muse at ground level in our favorite boat yard.
Viewed: 545 times.

Job One was to install a Permatrim on our Honda 150.
Job One was to install a Permatrim on our Honda 150.
Viewed: 539 times.

Widening the V-berth opening in the bulkhead proved much easier than we expected.
Widening the V-berth opening in the bulkhead proved much easier than we expected.
Viewed: 573 times.

I cemented teak L-molding in place. The final step is to fill the gaps, sand, and finish-oil the surround.
I cemented teak L-molding in place. The final step is to fill the gaps, sand, and finish-oil the surround.
Viewed: 588 times.

I installed Garelick cockpit steps that will mostly serve the port coaming (the side against the dock). But I also installed brackets on the starboard side -- in case. They are much easier to use than the built-in step.
I installed Garelick cockpit steps that will mostly serve the port coaming (the side against the dock). But I also installed brackets on the starboard side -- in case. They are much easier to use than the built-in step.
Viewed: 538 times.

Powered by Gallery v1



Page generation time: 1714168044.62s (PHP: 100% - SQL: 0%) - SQL queries: 8 - GZIP disabled - Debug on