Refer removed, floor waiting to be cut out.
Viewed: 930 times.
|
First small cut to check for clearance in hull.
Viewed: 780 times.
|
Hole enlarged.
Viewed: 777 times.
|
Mock up of tank dropped into place to verify fit.
Viewed: 828 times.
|
Cardboard mock up of tank in place.
Viewed: 849 times.
|
Test block to get floor angles right.
25 deg. port, 21 deg. Stbd.
Viewed: 804 times.
|
Shelf secured to hull.
Viewed: 771 times.
|
Shelf for new tank in place and drying.
Viewed: 768 times.
|
Replacement floor test fit in Refrigerator compartment.
Viewed: 780 times.
|
Existing holes in bulkhead used to route new water line and 12v wiring.
Viewed: 810 times.
|
Limber hole installed in bulkhead.
Viewed: 749 times.
|
Tank set in place, it fits!
Viewed: 757 times.
|
Vent and filler hoses in place.
Viewed: 759 times.
|
New fill pipe and vent below Port window.
Viewed: 769 times.
|
One way valve and Tee plumbed into original plumbing jumble on Stbd side.
Viewed: 854 times.
|
Tank and pump secured. Straight fitting used instead of 90 to relocate filler tube and deck plate.
Viewed: 954 times.
|