Album: UntitledChanged: 05/16/11
Contains: 3 items. Viewed: 592 times.
|
c-dory 001 forlorn/forgotten in the ghetto
Viewed: 1692 times.
|
c-dory 002 lots of custom drunken joinery
Viewed: 1339 times.
|
nestled in on her \"turtle joists\" ; wide enough to slide and turn her
Viewed: 1124 times.
|
misc2 004
Viewed: 1114 times.
|
most of the intrusion came from brilliant custom work like this
Viewed: 1122 times.
|
\"Hey Dude we need a dam so we can back-down on da big ones.\"
Viewed: 1143 times.
|
misc2 006
Viewed: 1077 times.
|
misc2 007
Viewed: 1039 times.
|
misc2 008 experimenting with elevations post cut-away
Viewed: 1067 times.
|
misc2 009
Viewed: 1133 times.
|
misc2 010
Viewed: 1057 times.
|
darker area is full-on rot/ lower 12\" was complete black soup and void
Viewed: 1129 times.
|
misc2 043
Viewed: 1126 times.
|
misc2 044
Viewed: 1113 times.
|
misc2 045
Viewed: 1126 times.
|
misc2 046-all foam flotation cleared out in 30 min. w/4 1/2" wire wheel on a right angle grinder. ALWAYS WEAR YOUR PERSONAL SAFETY EQUIP.!!!
Viewed: 1076 times.
|
feb. 2011 037 temporary "strong-back" straight edge to support "flexy tranny"
Viewed: 1000 times.
|
cleaned up and sanded
Viewed: 1001 times.
|
door skin and hot-glue scribe pattern
Viewed: 977 times.
|
3/4" marine ply - 1st layer
Viewed: 963 times.
|
feb. 2011 041 first layer ripped in half for ease of glue-up (manageable & less risk of air entrapment/voids)
Viewed: 989 times.
|
feb. 2011 043 1st layer rabbeted joint
Viewed: 1009 times.
|
feb. 2011 045 1st layer install - lower half w/temp. strongback straight-edge. extra 24oz. woven roving incorporated within glue-up
Viewed: 1080 times.
|