Album: UntitledChanged: 05/16/11
Contains: 3 items. Viewed: 599 times.
|
c-dory 001 forlorn/forgotten in the ghetto
Viewed: 1750 times.
|
c-dory 002 lots of custom drunken joinery
Viewed: 1359 times.
|
nestled in on her \"turtle joists\" ; wide enough to slide and turn her
Viewed: 1134 times.
|
misc2 004
Viewed: 1130 times.
|
most of the intrusion came from brilliant custom work like this
Viewed: 1141 times.
|
\"Hey Dude we need a dam so we can back-down on da big ones.\"
Viewed: 1164 times.
|
misc2 006
Viewed: 1097 times.
|
misc2 007
Viewed: 1057 times.
|
misc2 008 experimenting with elevations post cut-away
Viewed: 1084 times.
|
misc2 009
Viewed: 1150 times.
|
misc2 010
Viewed: 1068 times.
|
darker area is full-on rot/ lower 12\" was complete black soup and void
Viewed: 1140 times.
|
misc2 043
Viewed: 1140 times.
|
misc2 044
Viewed: 1130 times.
|
misc2 045
Viewed: 1138 times.
|
misc2 046-all foam flotation cleared out in 30 min. w/4 1/2" wire wheel on a right angle grinder. ALWAYS WEAR YOUR PERSONAL SAFETY EQUIP.!!!
Viewed: 1090 times.
|
feb. 2011 037 temporary "strong-back" straight edge to support "flexy tranny"
Viewed: 1013 times.
|
cleaned up and sanded
Viewed: 1015 times.
|
door skin and hot-glue scribe pattern
Viewed: 990 times.
|
3/4" marine ply - 1st layer
Viewed: 970 times.
|
feb. 2011 041 first layer ripped in half for ease of glue-up (manageable & less risk of air entrapment/voids)
Viewed: 1002 times.
|
feb. 2011 043 1st layer rabbeted joint
Viewed: 1021 times.
|
feb. 2011 045 1st layer install - lower half w/temp. strongback straight-edge. extra 24oz. woven roving incorporated within glue-up
Viewed: 1093 times.
|