The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 CD 18 Restoration 
Highlight for Album: Untitled
Album: Untitled
Changed: 05/16/11
Contains: 3 items.
Viewed: 155 times.

c-dory 001 forlorn/forgotten in the ghetto
c-dory 001 forlorn/forgotten in the ghetto
Viewed: 641 times.

c-dory 002 lots of custom drunken joinery
c-dory 002 lots of custom drunken joinery
Viewed: 594 times.

nestled in on her \
nestled in on her \"turtle joists\" ; wide enough to slide and turn her
Viewed: 342 times.

misc2 004
misc2 004
Viewed: 383 times.

most of the intrusion came from brilliant custom work like this
most of the intrusion came from brilliant custom work like this
Viewed: 398 times.

\
\"Hey Dude we need a dam so we can back-down on da big ones.\"
Viewed: 379 times.

misc2 006
misc2 006
Viewed: 355 times.

misc2 007
misc2 007
Viewed: 371 times.

misc2 008 experimenting with elevations post cut-away
misc2 008 experimenting with elevations post cut-away
Viewed: 352 times.

misc2 009
misc2 009
Viewed: 371 times.

misc2 010
misc2 010
Viewed: 364 times.

darker area is full-on rot/ lower 12\
darker area is full-on rot/ lower 12\" was complete black soup and void
Viewed: 424 times.

misc2 043
misc2 043
Viewed: 358 times.

misc2 044
misc2 044
Viewed: 342 times.

misc2 045
misc2 045
Viewed: 365 times.

misc2 046-all foam flotation cleared out in 30 min. w/4 1/2
misc2 046-all foam flotation cleared out in 30 min. w/4 1/2" wire wheel on a right angle grinder. ALWAYS WEAR YOUR PERSONAL SAFETY EQUIP.!!!
Viewed: 348 times.

feb. 2011 037 temporary
feb. 2011 037 temporary "strong-back" straight edge to support "flexy tranny"
Viewed: 269 times.

cleaned up and sanded
cleaned up and sanded
Viewed: 303 times.

door skin and hot-glue scribe pattern
door skin and hot-glue scribe pattern
Viewed: 285 times.

3/4
3/4" marine ply - 1st layer
Viewed: 264 times.

feb. 2011 041 first layer ripped in half for ease of glue-up (manageable & less risk of air entrapment/voids)
feb. 2011 041 first layer ripped in half for ease of glue-up (manageable & less risk of air entrapment/voids)
Viewed: 269 times.

feb. 2011 043 1st layer rabbeted joint
feb. 2011 043 1st layer rabbeted joint
Viewed: 267 times.

feb. 2011 045 1st layer install - lower half w/temp. strongback straight-edge. extra 24oz. woven roving incorporated within glue-up
feb. 2011 045 1st layer install - lower half w/temp. strongback straight-edge. extra 24oz. woven roving incorporated within glue-up
Viewed: 320 times.

Powered by Gallery v1



Page generation time: 1519260202.77s (PHP: 100% - SQL: 0%) - SQL queries: 8 - GZIP disabled - Debug on