The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Thataway  
The results of the major surgery--add small swim step, stair, better organized storage, and Radar Arch, and the RIB is winched aboard over the SS bar between the legs of the arch.

The results of the major surgery--add small swim step, stair, better organized storage, and Radar Arch, and the RIB is winched aboard over the SS bar between the legs of the arch.

From: thataway (thataway) (Sun Apr 14 19:20:35 2019)
Railing helped board the dinghy, swim ladder under the mat. Lazarettss on each side--port sealed off for inflatables

Powered by Gallery v1



Page generation time: 1713291213.75s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on