 Shoot Through The Hull Transducer Installation 
4 inch hole saw to begin the installation. Wanted it mounted as far aft as possible.
4 inch hole saw to begin the installation. Wanted it mounted as far aft as possible.
Viewed: 537 times.

Had water intrusion into the balsa core where the gas tank brackets were screwed in so I drilled those areas out with a hole saw.
Had water intrusion into the balsa core where the gas tank brackets were screwed in so I drilled those areas out with a hole saw.
Viewed: 443 times.

Marking the spot where the transponder base will be mounted.
Marking the spot where the transponder base will be mounted.
Viewed: 415 times.

Notice the three holes where the bilge pump was mounted. Another potential water leak into the balsa core.
Notice the three holes where the bilge pump was mounted. Another potential water leak into the balsa core.
Viewed: 436 times.

Cut into the lower area where water collects for the bilge pump and drain plug area so no puddles will form around the transponder mounting.
Cut into the lower area where water collects for the bilge pump and drain plug area so no puddles will form around the transponder mounting.
Viewed: 410 times.

Spent most of the winter drying out the core with a heat gun shooting into the holes when I had spare time.
Spent most of the winter drying out the core with a heat gun shooting into the holes when I had spare time.
Viewed: 418 times.

Viewed: 425 times.

Mounted the transponder base to the bottom of the boat with a thin bead of silicone to hold it in place, fiberglass resin will be poured around it.
Mounted the transponder base to the bottom of the boat with a thin bead of silicone to hold it in place, fiberglass resin will be poured around it.
Viewed: 445 times.

Undercut around the hole to give the fiberglass resin something to hold onto.
Undercut around the hole to give the fiberglass resin something to hold onto.
Viewed: 443 times.

Viewed: 466 times.

Cutting out the 3 screw holes for the bilge pump mount to screw into solid resin.
Cutting out the 3 screw holes for the bilge pump mount to screw into solid resin.
Viewed: 416 times.

Ready to pour the fiberglass resin mixed with colloidal silica.
Ready to pour the fiberglass resin mixed with colloidal silica.
Viewed: 415 times.

Resin poured.
Resin poured.
Viewed: 440 times.

Test fitting to make sure the transponder fits onto the base without hitting the resin.
Test fitting to make sure the transponder fits onto the base without hitting the resin.
Viewed: 437 times.

Viewed: 400 times.

Filling all the holes with fiberglass resin.
Filling all the holes with fiberglass resin.
Viewed: 394 times.

Viewed: 401 times.

A whole buncha holes filled.
A whole buncha holes filled.
Viewed: 417 times.

Viewed: 431 times.

Viewed: 420 times.

Sanding the deck flat.
Sanding the deck flat.
Viewed: 408 times.

Ready to finish the fiberglass surrounding the mount.
Ready to finish the fiberglass surrounding the mount.
Viewed: 417 times.

Used an old piece of line to ensure the shape of the cutout is somewhat the same all the way around.
Used an old piece of line to ensure the shape of the cutout is somewhat the same all the way around.
Viewed: 421 times.

Fiberglassing over the line.
Fiberglassing over the line.
Viewed: 428 times.