The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Poor Man's Custom Cover 
Four 10 foot lengths of PVC pipe laid between the cabin top hand hold and the
Four 10 foot lengths of PVC pipe laid between the cabin top hand hold and the "bump" in the CD 16 cabin top.
Viewed: 967 times.

The
The "custom" frame piece at the bow made by using a hot air gun to bend the pipe.
Viewed: 936 times.

The $20 plastic tarp thrown over the boat.  Measure the amount it hangs down too much front and rear and cut a dart in the middle.  Piece it back together with duct tape.
The $20 plastic tarp thrown over the boat. Measure the amount it hangs down too much front and rear and cut a dart in the middle. Piece it back together with duct tape.
Viewed: 974 times.

Now the edges hang down evenly to the trailer and are ready for attachment with bungee stoppers.  I'm not worried about a little water dripping through, as there is enough ventilation.  The cover is for protection from pitch, bird poop, leaves, pine needles, etc.
Now the edges hang down evenly to the trailer and are ready for attachment with bungee stoppers. I'm not worried about a little water dripping through, as there is enough ventilation. The cover is for protection from pitch, bird poop, leaves, pine needles, etc. *
Viewed: 1011 times.

* Comments available for this item.
Powered by Gallery v1



Page generation time: 1711625689.86s (PHP: 100% - SQL: 0%) - SQL queries: 9 - GZIP disabled - Debug on