weight of battery had fatigued fiberglass which de-laminated
Viewed: 1021 times.
|
It could be peeled by hand in places - wood saturated
Viewed: 719 times.
|
shop vac then through tubes inserted in grid of holes
Viewed: 717 times.
|
Blower and Floodlights 24/7 through some of the driest weather we\'ve experienced... LUCKY!
Viewed: 689 times.
|
fill void with expanding foam (anti mildew also) - trim excess
Viewed: 679 times.
|
multiple hand laid heavy duty fiberglass - West Systems Epoxy
Viewed: 662 times.
|
corner complete - now for heavy duty battery support
Viewed: 634 times.
|
3/4 Marine Ply w/ 2X2 railings and double straps
Viewed: 642 times.
|
on deck with 5200 and countersunk screws - there to stay (hopefully)
Viewed: 651 times.
|
after cleaning the bilge with bleach and Jo Max I took a break and came back to find this puddle that had seeped from the anchor locker aft to the V-berth (the boat was on trailer with bow elevated)
Viewed: 630 times.
|
a shim of treated wood raised the bottom of the locker to at least the level of the drain
Viewed: 625 times.
|
layers of glass and epoxy followed by epoxy paint (light coat on the inside of the drain as well)
Viewed: 936 times.
|
|
|
|
|
Album: First FixesBow Roller Mods for Mantus M-2 Changed: 01/14/25
Contains: 1 item. Viewed: 388 times.
|
Album: END OF ENDEAVORChanged: 01/13/25
Contains: 10 items. Viewed: 287 times.
|
Album: My New MARINAUTChanged: 01/13/25
Contains: 10 items. Viewed: 239 times.
|
Album: ANCHOR UPGRADEChanged: 01/12/25
Contains: 13 items. Viewed: 301 times.
|