1st layer down and topside wet out
Viewed: 257 times.
|
|
putting together the pieces
Viewed: 207 times.
|
|
pressing the coring down
Viewed: 220 times.
|
coring bonded to the bottom skin (2 layers)
Viewed: 227 times.
|
grinding a radius on the edges of the sump
Viewed: 242 times.
|
had to grind down some minor irregularities
Viewed: 233 times.
|
|
|
|
|
|
|
|
|
I do my best to try and keep a wet edge with the epoxy, so I all bonds chemically. here, the epoxy I used to make the fillets along the sides gelled and the thin scrim layer on top of the balsa had areas that where disturbed, and the fibers stuck up and then the epoxy gelled like that. the result was that my glass cloth would not lay down, even though I had been keeping a wet edge during the install. I had to grind these ripples out later
Viewed: 223 times.
|
|
|
|
gouging coring on the gunnel with allen wrench
Viewed: 238 times.
|
fuel fill hole
Viewed: 253 times.
|
windlass area
Viewed: 252 times.
|
hawse hole
Viewed: 244 times.
|