The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Cutty, 2009 23 Venture "Pacific Wanderer" 
Cutty, Forward to Port.
Wooden boat paddle held up under port forward deck.
Access hatch to storage locker.
Cutty, Forward to Port.
Wooden boat paddle held up under port forward deck.
Access hatch to storage locker.
Viewed: 498 times.

1st - a large forward
1st - a large forward "V" shaped storage locker.
2nd - 6" round access hatch to the inside of the stem and under the anchor locker. This hatch gives clear access down under the "V" storage locker and under the cabin sole to the cabin 6" access access hatch at the inside of the door bulkhead.
3rd - Rectangular Hatch cover opens to the anchor locker.
Viewed: 425 times.

Cutty, forward to starboard.
Wooden boat paddle held up under port forward deck.
Access hatch to storage locker.
Cutty, forward to starboard.
Wooden boat paddle held up under port forward deck.
Access hatch to storage locker.
Viewed: 437 times.

Aft to Starboard.
Access cover to back of Helm.
Aft to Starboard.
Access cover to back of Helm.
Viewed: 433 times.

Aft to Port.
Aft to Port.
Viewed: 439 times.

6
6" Access hatch to stem.
At the time the picture was taken I was finishing the last of 4 coats of Clear Satin 1100 Varathane on all the teak inside the Cabin and Cutty. Blue Painters Tape - Good Stuff.
Viewed: 406 times.

Two sheet layers of flexable foam insulation. This is the only area in the boat that I collect any dampness from condensation. This access hole allowed me to insulate the area and to help better control condensation at this spot.
Two sheet layers of flexable foam insulation. This is the only area in the boat that I collect any dampness from condensation. This access hole allowed me to insulate the area and to help better control condensation at this spot.
Viewed: 366 times.

looking from within the hole, forward at the stem, and under the anchor locker.
looking from within the hole, forward at the stem, and under the anchor locker.
Viewed: 396 times.

Looking straight down the access hole and at the inside of the stem.
Looking straight down the access hole and at the inside of the stem.
Viewed: 392 times.

Looking straight down at the inside of the stem and a bit aft. The orange is the backside of the forward
Looking straight down at the inside of the stem and a bit aft. The orange is the backside of the forward "V" storage locker bulkhead. There is about a 2" clearance under the "V" storage locker.
Viewed: 376 times.

Looking up the inside of the stem and the insulation under the anchor locker and back to the
Looking up the inside of the stem and the insulation under the anchor locker and back to the "V" storage locker.
Viewed: 403 times.

The machine screws are 1-3/4
The machine screws are 1-3/4" long and are nutted to hold the hatch in place, then nutted again with fender washers to hold the insulation in place. The perimeter of the sheet insulation is wedged in place by fit and the reverse angle of the hull.
Viewed: 505 times.

Powered by Gallery v1



Page generation time: 1718497203.76s (PHP: 100% - SQL: 0%) - SQL queries: 8 - GZIP disabled - Debug on