The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Anchor-locker drain 
Overview
Overview
Viewed: 885 times.

Close-up
Close-up
Viewed: 829 times.

epoxied drain holes annotated
epoxied drain holes annotated
Viewed: 772 times.

Clamshells
Clamshells
Viewed: 728 times.

Eye nut
Eye nut
Viewed: 698 times.

anchor locker eye nut 1
anchor locker eye nut 1
Viewed: 702 times.

anchor locker eye nut 2
anchor locker eye nut 2
Viewed: 693 times.

bow with new clamshell
bow with new clamshell
Viewed: 753 times.

Bulkhead seam filleted and fiberglass taped.  This also sealed the disused hole in the locker/berth bulkhead from which I had removed a small eye-nut.
Bulkhead seam filleted and fiberglass taped. This also sealed the disused hole in the locker/berth bulkhead from which I had removed a small eye-nut.
Viewed: 773 times.

Powered by Gallery v1



Page generation time: 1716450149.5s (PHP: 100% - SQL: 0%) - SQL queries: 4 - GZIP disabled - Debug on