The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Durring.. 
Bench seat removed (that was a chore!!)
Bench seat removed (that was a chore!!)
Viewed: 569 times.

Galley almost done....
Galley almost done....
Viewed: 613 times.

Dinette before..love those little rusty brackets and tiny screws...ppppffffftttttt!!!!
Dinette before..love those little rusty brackets and tiny screws...ppppffffftttttt!!!!
Viewed: 601 times.

Strengthening the supports
Strengthening the supports
Viewed: 559 times.

Strengthening the supports
Strengthening the supports
Viewed: 516 times.

Dinette floor before removal, lots of potential here....
Dinette floor before removal, lots of potential here....
Viewed: 525 times.

Dinette floor removed...oh boy!
Dinette floor removed...oh boy!
Viewed: 554 times.

Highlight for Album: Water Tank Installation
Album: Water Tank Installation

Water Tank Installation
Changed: 03/03/12
Contains: 5 items.
Viewed: 570 times.

Hinged Helm Seat. I was planning putting Formica here as additional galley workspace but I am running out of time, patience and money!!
Hinged Helm Seat. I was planning putting Formica here as additional galley workspace but I am running out of time, patience and money!!
Viewed: 500 times.

Panel \
Panel \"Before\" (Should have seen the back-yeesh!)
Viewed: 474 times.

Highlight for Album: Bennett Trim Tab Reservoir Correction.
Album: Bennett Trim Tab Reservoir Correction.
Changed: 04/30/11
Contains: 3 items.
Viewed: 630 times.

Powered by Gallery v1



Page generation time: 1716431892.66s (PHP: 100% - SQL: 0%) - SQL queries: 4 - GZIP disabled - Debug on