The C-Brats Forum Index
HomeForumsMy TopicsCalendarEvent SignupsMemberlistOur C-DorysThe Brat MapPhotos

 Lazarettes  
Fiberglass backing plate added to cleat.  First, core removed around fastener perimeters, then re-filled with thickened epoxy (hole in deck not enlarged; work done from below).  Next, backing plate set in place with

Fiberglass backing plate added to cleat. First, core removed around fastener perimeters, then re-filled with thickened epoxy (hole in deck not enlarged; work done from below). Next, backing plate set in place with "mush" of thickened epoxy. Then holes redrilled through all and cleats re-bedded with butyl tape and re-fastened with new, 316 stainless fasteners.


Powered by Gallery v1



Page generation time: 1718481386.65s (PHP: 100% - SQL: 0%) - SQL queries: 8 - GZIP disabled - Debug on